Feed-in Tariff Specialists

Still on the Feed-in Tariff?

You may be able to add a battery, upgrade ageing panels, and switch export to SEG — without losing your Feed-in Tariff generation payments. Free FIT reviews across East Sussex.

FIT upgrades, explained clearly

It's common to worry that any change will stop your Feed-in Tariff. In many cases, upgrades are possible - as long as they're designed around your metering and the paperwork is handled properly.

Upgrades that are often possible

  • Add battery storage (in many cases)
  • Replace a failing inverter with the right approach
  • Switch export from deemed to measured SEG (where suitable)

Areas we check first

  • Metering and export arrangements
  • Paperwork and notifications to the right parties
  • Any system expansion beyond the accredited FIT portion

Common Myths About FIT Systems

Many homeowners were told "don't touch anything" when their solar was installed. Here's what's actually true:

"If I change anything, I'll lose my Feed-in Tariff."

Reality: In most cases, your FIT generation payments continue as normal when upgrades are handled properly. The generation tariff is tied to the accredited system — adding a battery or replacing equipment doesn't automatically end your payments. The key is proper documentation and notification.

"Batteries aren't allowed on FIT systems."

Reality: This is one of the most common misconceptions. A battery stores electricity you've already generated — it doesn't change what your generation meter records. Many FIT customers have successfully added batteries while keeping their generation payments.

"My export payment is fixed — there's no point changing it."

Reality: Many FIT systems have "deemed export" — your supplier assumes you export 50% of what you generate, regardless of actual usage. Today, you can often switch to a measured Smart Export Guarantee (SEG) tariff, which can pay significantly more per unit exported.

"My panels are fine — they don't need replacing."

Reality: Panels from the early 2010s still work, but modern panels produce considerably more power from the same roof area. If you're seeing reduced performance or want to maximise your system, a panel upgrade can make a real difference — and your FIT generation continues.

How Your FIT Payments Actually Work

Understanding the two parts of your Feed-in Tariff is the key to knowing what you can change — and what you should protect.

Generation Tariff

This is the valuable part — protect it
  • ✓Paid on every kWh your system generates
  • ✓Measured by your generation meter
  • ✓Continues for the term set when your system was accredited, 20 years for most solar PV and 25 for some of the earliest. Your FIT statement shows the end date.
  • ✓Adding a battery does not affect this in most cases

Export Tariff

Often worth upgrading to SEG
  • ✓Paid on electricity you send back to the grid
  • ✓Often "deemed" at 50% — an old estimate, not actual usage
  • ✓Typically a lower rate than modern SEG tariffs
  • ✓Can often be switched to metered SEG for better returns
Keep generation + upgrade export = best of both

How a FIT Review Works

A simple review of your current setup, followed by clear options for what to do next (if anything).

1) Quick check

We ask a few questions and (if possible) look at photos of your inverter and meters to understand your current setup.

2) Site visit (when needed)

If needed, we check metering, cable routes, space for equipment, and your consumer unit so any recommendation is accurate and safe.

3) Clear options

We explain the options that apply to your system: battery, export switch, inverter replacement, or panel improvements.

Your Upgrade Options

Every system is different. Here are the most common upgrades we carry out for FIT customers — always designed to protect your existing tariff position.

Add Battery Storage

Most popular upgrade

Store daytime solar for evening use and reduce what you buy from the grid. Your FIT generation continues as normal.

  • ✓Use more of your own solar electricity
  • ✓Reduce grid import costs
  • ✓FIT generation payments unaffected

Replace Older Panels

Efficiency upgrade

Modern panels produce significantly more power from the same roof area. Ideal if your panels are showing their age or underperforming.

  • ✓More power from the same roof space
  • ✓Improved reliability
  • ✓FIT generation based on accredited capacity

Add Extra PV Capacity

Expand your system

Add extra panels beyond your original system. Your FIT generation stays for the original accredited portion; the new capacity is treated separately.

  • ✓Generate more electricity overall
  • ✓Original FIT payments continue
  • ✓New capacity eligible for SEG export

Inverter Upgrade

AC-coupled or hybrid

Replace or supplement your inverter to support battery charging and improved performance. We choose the approach that protects your metering setup.

  • ✓Support battery integration
  • ✓Better efficiency and monitoring
  • ✓Metering arrangements kept compliant

All upgrades are subject to site survey and system assessment. We'll recommend the best approach for your specific setup.

Deemed Export vs Smart Export Guarantee

Many FIT customers are still on "deemed export" — an old estimate that may be costing you money. Here's the difference.

Old method

Deemed Export

  • •Export assumed at 50% of generation
  • •Not based on actual meter readings
  • •Typically a lower rate per kWh
  • •No incentive to export more or less
Modern alternative

Smart Export Guarantee (SEG)

  • ✓Export measured by smart meter readings
  • ✓Paid on what you actually export
  • ✓Tariffs often higher than legacy deemed rates
  • ✓Choice of providers and tariff types

What we usually recommend

Keep your FIT generation tariff as-is, and consider switching export to SEG where it benefits you and the metering supports it. Some SEG tariffs can be around 15p/kWh, depending on supplier and product at the time. We'll always check what's available and recommend the best option for your circumstances.

Why Eastbourne Energy?

FIT upgrades are often about doing the details properly: metering, documentation, and a design that fits your home. We focus on clear advice and a safe, compliant installation.

FIT-Safe Approach

We review your FIT setup first and design upgrades that protect your generation payments.

MCS Accredited

Fully accredited for solar PV and battery installations with proper certification.

Local East Sussex

Based in Eastbourne, covering all of East Sussex. Local support after the job matters.

Proper Paperwork

We handle the right notifications and documentation (FIT licensee, supplier, export provider) as needed.

Plain English

No jargon - we explain your options clearly so you can make an informed decision.

End-to-End

From review through installation and commissioning, with full handover documentation.

Frequently Asked Questions

Will I lose my Feed-in Tariff if I add a battery?

In many cases, no - the battery sits alongside your system and changes when you use electricity, not whether you're paid for generation. The best approach depends on your metering and system setup, which we'll review.

Can I replace panels or the inverter and keep my FIT?

Often, yes - but it needs to be handled properly with the right documentation and notifications. We'll advise the safest upgrade route for your setup.

Do you need to visit my property for a FIT review?

Sometimes we can answer the basics from a quick call and a couple of photos, but most upgrades benefit from a site visit so we can check metering, space for equipment, cable routes, and your existing consumer unit. We'll tell you what's needed after your enquiry.

What is "deemed export"?

Older FIT systems often did not measure export. For solar PV of 30 kW or less, where export could not practically be metered, the scheme assumed you exported 50% of what you generated and paid you on that estimate (Ofgem FIT guidance, deemed export).

What is the Smart Export Guarantee (SEG)?

SEG is the modern export scheme where export is metered and paid at a tariff set by your export provider. It replaced the old export tariff for new applicants.

Can I keep FIT generation payments and move export to SEG?

In many cases, yes. FIT generation is paid from your generation meter, while export can often be moved to a measured SEG arrangement if your setup supports it. We'll explain what's possible for your specific metering and provider.

Can I get around 15p per kWh for export?

Export rates vary by provider and tariff. Some SEG tariffs can be around that level, but we'll always check what's available at the time and recommend the best option for your circumstances.

Do I need a smart meter to move to SEG export?

Usually you need export to be measured, which is commonly done via a smart meter (or an export meter). If you don't have one yet, we can explain what options you have and what the likely steps are.

Do I need approval before upgrades?

What has to be agreed before the work and what can be notified afterwards depends on the change and your setup (FIT licensee, export provider, metering and grid connection). We confirm this with you before booking any work.

What should I have ready for the review?

If you can, have a recent FIT statement and take a couple of photos of your inverter and meters (generation meter and electricity meter). If you don't have anything to hand, that's fine - we'll guide you through it.

Sources and review

Reviewed

Your own Feed-in Tariff terms are set by when your system was accredited. Your FIT statement is the record that applies to you.

  1. Feed-in Tariffs (FIT): Guidance for Generators — Ofgem (accessed 2026-09-06)
  2. Feed-in Tariffs (FIT): Generators — Ofgem (accessed 2026-09-06)
  3. Feed-in Tariffs (FIT): Guidance for Licensed Electricity Suppliers — Ofgem (accessed 2026-09-06)
  4. Feed-in Tariffs (FIT): Payments and tariffs — Ofgem (accessed 2026-09-06)
  5. Guidance for generators: Co-location of electricity storage under the RO, FIT, REGO and SEG (v6.2) — Ofgem (accessed 2026-09-06)
  6. SEG: Guidance for Generators (December 2019) — Ofgem (accessed 2026-09-06)
  7. Smart Export Guarantee (SEG): Generators — Ofgem (accessed 2026-09-06)
  8. Engineering Recommendation G98, Issue 2 (2025) — Energy Networks Association, copy hosted by the GB Distribution Code (accessed 2026-09-06)
  9. Engineering Recommendation G99, Issue 2 (2025) — Energy Networks Association, copy hosted by the GB Distribution Code (accessed 2026-09-06)

All installations and upgrades are subject to site survey, system assessment, and the specific metering/export arrangements for each property. Export tariffs vary by supplier and product. We'll always explain options clearly before any work goes ahead. Eastbourne Energy Ltd is MCS accredited and RECC approved.