Expert installers in Seaford

5.0★ Rating
MCS Certified
500+ Installations

Solar Panels & Battery Storage in Seaford

Expert Solar & Battery Installers Serving Seaford & East Sussex

Solar PV installs across Seaford (BN25) with clear quotes, tidy installs, and straightforward aftercare.

Quick Installation

Usually 2-3 weeks

Free Quotes

No obligation

Real Customer Feedback

Solar & Battery Seaford – Customer Reviews

Recent feedback from homeowners and businesses we’ve helped across East Sussex.

Why Choose Us

Why homeowners choose us in Seaford

Clear advice, tidy installs, and aftercare you can actually reach.

A system that fits your roof

We design around roof orientation, shading, and access so output is predictable across seasons.

An install you can trust

Layouts are planned around roof pitch, shading, and your daily usage — not a generic template.

Aftercare & monitoring

If you add a battery, we’ll size it to shift usage into evenings rather than oversell capacity.

MCS certifiedRECC approvedDNO + paperwork handled

Solar panel installers in Seaford

As local solar panel installers, we offer clear advice, tidy installs, and aftercare you can reach. We’ll survey, design, scaffold (if needed), install and commission — and we’ll handle the DNO + MCS paperwork. If you want battery storage now (or later), we’ll design the system to suit.

Local installs
45+
around Seaford
On-site time
1–2 days
most homes
Panel cover
25-year panel cover
plus workmanship

What you get

  • Design matched to your usage
  • Battery-ready design (optional now or later)
  • Scaffolding arranged where needed
  • DNO application + MCS certificate
  • Monitoring setup + clear handover
  • Tidy install and respectful on-site work
  • Straightforward aftercare
Want typical costs first? Jump to costs.

Coverage map

Approximate

Loading map...

Coverage snapshot

Postcodes + local areas

Postcodes

BN25

Neighbourhoods

Seaford HeadBishopstoneSouth HillEast BlatchingtonChyngtonAlfristonCuckmere Valley

Don’t see your exact postcode? We’re often nearby — ask and we’ll confirm coverage quickly.

Local track record

45+

Installations in and around Seaford

Solar Panels Seaford – Costs & Pricing

Typical installs land between £5,999 and £12,000, depending on roof layout, system size, and whether you add a battery. We'll give you a fixed, itemised quote before any work starts.

Typical system range
£8,200 - £10,100
Itemised after survey
Survey to switch-on
4–6 weeks
Includes DNO + paperwork
Equipment cover
25-year panel cover
Plus workmanship cover
Average annual saving
£845/yr typical
Depends on usage + tariff

45+ installations completed in and around Seaford.

Typical system sizes

Swipe on mobile

4kW System

£6,050 - £7,450

2-3 bed homes

Panels10 panels
Est. Savings£600-£800/year
Most Popular

6kW System

£8,200 - £10,100

3-4 bed homes

Panels15 panels
Est. Savings£900-£1,200/year

8kW System

£10,500 - £12,400

4+ bed homes

Panels20 panels
Est. Savings£1,200-£1,600/year

Want a quote that's accurate for your roof in Seaford?

Get an itemised quote

What's included

Standard installation

  • ✓Solar panels and inverter
  • ✓Scaffolding (where required)
  • ✓Electrical work and commissioning
  • ✓MCS certification
  • ✓DNO (grid) application support
  • ✓Monitoring setup
  • ✓5-year workmanship guarantee

Common add-ons

  • Battery storageFrom +£2,500
  • EV charger installationFrom +£800
  • Bird protectionFrom +£300
  • Maintenance planFrom £240/year

Want a price that fits your roof and usage? We'll keep it simple and itemised.

Final price depends on roof layout, access and DNO requirements.

Our Solar Installations in Seaford

See where we've installed solar panels across Seaford. Each pin represents a completed installation by our team.

Loading installations map...

Solar installation timeline — Seaford

A straightforward run-through of what happens from first survey to switch-on. Most installs take around 4–8 weeks end-to-end, with 1–2 days on-site.

1
Week 1
45–60 min

Free site survey

We assess roof space, shading, access and your usage, then confirm a system size that fits.

Roof + shading checkUsage goalsAccess / scaffold plan
2
Week 1–2
2–5 days

Design + itemised quote

You get a clear layout, expected generation, and a fixed, itemised quote so there are no surprises.

Panel layoutInverter / battery locationSavings assumptions
3
Week 2–4
1–3 weeks

DNO + paperwork handled

We handle the DNO application and certification paperwork while we schedule the install.

DNO applicationMCS paperworkInstall date booked
4
Week 3–6
1–2 days

Installation on-site

Our team installs and commissions the system with minimal disruption and a tidy finish.

Scaffolding (if needed)Install + commissioningHandover
5
Week 4–8
Same day

Switch-on + monitoring

We set up monitoring so you can see production from day one, and help you understand what “good” looks like.

Monitoring setupExport settingsSupport if you need it

Good to know

  • Install day is usually 1–2 days (site-dependent).
  • We handle DNO + certification paperwork as part of the job.
  • You’ll get monitoring set up so you can track performance.
  • Battery storage can be included now, or added later (system-dependent).

Before we visit

If you can share a couple of details up-front, we can give a more accurate design and quote first time.

  • Your address + postcode
  • Any recent electricity bills (optional)
  • Planned add-ons (battery / EV / heat pump)
  • Any access constraints (terrace, shared driveway, etc.)

What happens next

On install day

  • We protect floors/paths and keep things tidy
  • Commissioning + safety checks before we leave
  • Clear handover of what to expect day-to-day

After switch-on

  • Monitoring is set up so you can track generation
  • We’ll confirm export settings and next steps
  • Support is there if you have questions later

Solar & Battery Questions – Seaford

Quick Answers About Solar Panels & Battery Storage in Seaford

Common questions answered at a glance - get the facts before requesting your quote

📋
Planning permission needed?
Usually no - most installations are permitted development
⏱️
How long to install?
1-2 days for installation, 4-8 weeks total process
💰
Typical payback period?
8-12 years, then 15+ years of free electricity
💳
Financing available?
Yes - from £99/month with flexible payment terms
🛡️
What warranty is included?
5-year workmanship guarantee on all installations
🔋
Can I add battery later?
Yes - batteries can be retrofitted to existing systems

Loading contact form...