UK Power Networks and G99: How Long Applications Take
What a G99 grid application is, which East Sussex systems need one, and the timescales the national rules actually set for the network operator.
6 Sept 2026
ReadIntermediate
G98/G99, export limits, planning permission, and DNO applications.
2 articles in this section.
What a G99 grid application is, which East Sussex systems need one, and the timescales the national rules actually set for the network operator.
A guide to navigating G98 applications for solar installations in the UK, covering common issues, DNO interactions, and key considerations.
Done reading?
Every home is different. Book a free survey and we'll walk you through what solar, batteries, or tariffs actually mean for your property.
No obligation · MCS certified · Typically installed within four weeks of enquiry